BIH are honoured to have been part of this prestigious project, and are pleased to have supported Equinor by supplying the 3 off 10.5 MW Hot Water Heaters required for this offshore platform.
Jamie Mullane
Application of fired heaters in an offshore environment is unusual and requires a sophisticated engineering approach to ensure appropriate levels of health and safety considerations. The heaters were supplied fully modularised, including full installation of the burner piping system & heater instrumentation, in order to minimise site erection duration. The scope also included engineering and supply of fuel gas skids and forced draft fans.
We will continue to provide technical assistance to Equinor with any of their fired heater needs on this project and provide additional support wherever they may require it.
The in house subject matter expertise that BIH has is unparalleled and if you require fired heater or WHRU design services, supply, installation, commissioning or spare parts for existing units, we have a team of experts dedicated to finding an innovative solution for you. Please contact us and our team will be happy to help.